Porcelain patio with lawn surround, Gloucester

The garden was a builder's finish on a new-build plot: soft ground, no falls, no defined edges. It was dug out, re-levelled and paved in porcelain around a central lawn, with a charcoal sett course separating the two.

Key facts

Town
Gloucester
Year
2025
Surface
Porcelain paving, charcoal sett edge course
Lawn
Framed on all four sides by paving
01

Why frame the lawn with paving on all four sides?

It removes every awkward edge. There is no strip of grass against a fence that a mower cannot reach, the lawn cannot creep into the paving, and the sett course gives the mortar something solid to finish against instead of dying into soil.

02

What was done to the ground before any slab was laid?

The plot was excavated to formation, soft new-build spoil taken away and a sub-base built up and compacted in layers. Falls were then set away from the house before bedding started — you cannot correct a fall once slabs are down.

  • Soft topsoil and builder's spoil removed
  • Sub-base compacted in layers, not one dump
  • Falls set away from the house and doors before bedding
03

How long does a garden of this size take?

A rebuild at this scale is typically one to two weeks of working days depending on ground conditions, spoil removal and weather. Groundworks take longer than laying; the paving itself is the fastest part of the job.

Questions

Frequently asked

Can you work around a new-build's drainage runs?

Yes. New-build plots usually have shallow service runs and chambers in awkward places. We locate them before excavating and set covers into the finished surface rather than paving over them.