Solid GroundPaving
CallWhatsAppGet a quote
What we do

Services

Six services, all built on the same principle: the structure underneath decides how long the surface lasts. Each page states the build-up we use, the indicative cost band and the realistic duration.

Key facts

Driveways
£54–£160 per m² · 3–6 days
Tarmac Driveways
£54–£94 per m² · 3–5 days
Block Paving
£81–£140 per m² · 4–7 days
Resin Bound Driveways
£94–£160 per m² · 2–4 days over an existing sound base
Commercial Surfacing
£61–£120 per m² · Phased to the site — typically 1–3 weeks
Groundworks
priced by scope per m² · Varies by scope

What is included in driveways?

Domestic driveway construction across Somerset and Bristol — excavation, sub-base, edge restraint and surfacing, built to the depths the ground actually needs.

Typical duration 3–6 days. Expected lifespan 20–25 years with correct build-up. Indicative cost £54–£160 per m² — indicative only, a written price follows a site survey.

What is included in tarmac driveways?

Machine and hand-laid tarmac driveways with a properly compacted Type 1 sub-base, AC20 binder course and AC6 surface course.

Typical duration 3–5 days. Expected lifespan 20 years plus. Indicative cost £54–£94 per m² — indicative only, a written price follows a site survey.

What is included in block paving?

Concrete and clay block paving on a compacted sub-base and sharp sand laying course, with restrained edges and kiln-dried jointing sand.

Typical duration 4–7 days. Expected lifespan 25 years plus. Indicative cost £81–£140 per m² — indicative only, a written price follows a site survey.

What is included in resin bound driveways?

UV-stable resin bound aggregate over a sound bound base — seamless, permeable and smooth underfoot.

Typical duration 2–4 days over an existing sound base. Expected lifespan 15–20 years. Indicative cost £94–£160 per m² — indicative only, a written price follows a site survey.

What is included in commercial surfacing?

Car parks, access roads, yards and playgrounds surfaced with machine-laid tarmac, phased to keep sites operational.

Typical duration Phased to the site — typically 1–3 weeks. Expected lifespan 20 years plus with maintenance. Indicative cost £61–£120 per m² — indicative only, a written price follows a site survey.

What is included in groundworks?

Excavation, foundations, footings, drainage and hard landscaping — the work that happens before anything visible does.

Typical duration Varies by scope. Expected lifespan Design life of the structure above. Indicative cost priced by scope per m² — indicative only, a written price follows a site survey.

Machine-readable version of this page: /services.md · canonical https://solidgroundpaving.co.uk/services