2022 · Site video

Cutting in block paving, Gloucester

Filmed part-way through a driveway. The field blocks go down quickly; the time goes into the perimeter, where every block is measured and cut on a saw so it fits the gap exactly rather than being made up with mortar.

Key facts

Town
Gloucester
Year
2022
Stage
Cutting in, before jointing and compaction
Method
Wet-cut on saw, no mortar packing
01

What does cutting in mean?

It is the process of filling the gap between the laid field and the edge restraint. Each block is measured against the actual gap, marked and cut on a saw, then bedded so it carries load like a full block instead of floating on sand.

02

Why not fill small gaps with mortar?

Mortar packing and thin slivers are the first parts of a driveway to break up. They have no interlock, water gets behind them and frost lifts them out within a couple of winters. Cutting properly costs a day; repairing a failed perimeter costs far more.

  • No cut narrower than roughly a third of a block
  • Cuts kept off the wheel track wherever the setting out allows
  • Cut faces turned in so the sawn edge is not the visible one
03

What happens after cutting in?

Kiln-dried sand is brushed across the whole area, the driveway is vibrated with a plate compactor on a rubber sole, then sand is topped up and vibrated again. Two passes matter — one pass leaves half-empty joints that let blocks rock.

Questions

Frequently asked

Is dust from cutting a problem for neighbours?

We wet-cut, which keeps silica dust down. It is a legal requirement as well as good practice, and it keeps the mess off cars and windows.